Skip to Content
  • Calendar
  • Bids
  • Education
  • Report a Problem
  • FAQs
  • Contact Us
  • My Account
  • Pay Bill

Macon Water Authority logo Macon Water Authority

  • Customer Service
    • Online Bill Pay
    • Check Your Account
    • Payment Options
    • Establish an Account
    • Rates, Fees, & Charges
      • 2023 GA Water & Wastewater Rates
    • Landlord Service Agreement
  • Operations
    • Field Operations
      • Water Distribution
      • Sewer Conveyance (Collection)
      • CMOM
      • Sewer System Maintenance & Construction
      • Engineering
        • GIS
        • Backflow Prevention
        • Grease Management
        • Engineering Permits
        • MWA Design & Construction Specifications
    • Water Operations
      • Production
      • Storage
      • Laboratory & Environmental Compliance
        • Environmental Stewardship
      • Wastewater Operations
        • Water Reclamation Facilities
        • Macon Soils
      • Stormwater Management
        • Stormwater Project Map
    • Capital Improvement Projects
      • Call Before You Dig
  • Public Information
    • News & Updates
    • Publications
    • Water Outages and Advisories Map
    • Steps for Addressing Concerns with the Board at MWA
    • Spill & Overflow Notifications
    • Sewer Use Rules
    • Fishing at Javors Lucas Lake
  • Your MWA
    • Board Members
    • Staff
    • Awards
    • Supporting Economic Development
    • Community Involvement
    • Macon Water Alliance
  • Careers
    • Employment
    • Internships
  • Bids
    • Construction Bids
    • Financial Bids
    • Purchase & Vendor Bids
    • Purchasing Policy

Macon Water Authority logo Macon Water Authority

  • Customer Service
    • Online Bill Pay
    • Check Your Account
    • Payment Options
    • Establish an Account
    • Rates, Fees, & Charges
      • 2023 GA Water & Wastewater Rates
    • Landlord Service Agreement
  • Operations
    • Field Operations
      • Water Distribution
      • Sewer Conveyance
      • CMOM
      • Sewer System Maintenance & Construction
    • Engineering
      • Backflow Prevention
      • GIS
      • Grease Management
      • Engineering Permits
      • MWA Design & Construction Specifications
    • Water Operations
      • Production
      • Storage
    • Laboratory & Environmental Compliance
      • Environmental Stewardship
    • Wastewater Operations
      • Water Reclamation Facilities
      • Macon Soils
    • Stormwater Management
      • Stormwater Project Map
    • Capital Improvement Projects
    • Call Before You Dig
  • Public Information
    • News
    • Publications
    • Outages and Advisories Map
    • Steps for Addressing Concerns with the Board at MWA
    • Spill & Overflow Notifications
    • Sewer Use Rules
    • Fishing at Javors Lucas Lake
  • Your MWA
    • Board Members
    • Staff
    • Awards
    • Supporting Economic Development
    • Community Involvement
    • Macon Water Alliance
  • Careers
    • Internships
  • Bids
    • Construction Bids
    • Financial Bids
    • Purchase and Vendor Bids
    • Purchasing Policy
  • Customer Service
  • Calendar
  • Bids
  • Education
  • Report a Problem
  • FAQs
  • Contact Us
  • My Account
  • Pay Bill
All Construction Bids

Lower Poplar Water Reclamation Facility Influent Pump Station Improvements

Date Created: July 11, 2024
Deadline: August 27, 2024 2:00 pm
Bid #: 51ISP2-IMP-1
Bid Type: Construction
Associated Documents:
  • Invitation to Bid
  • Contract Documents and Specifications
  • Plan Drawings
  • Plan Holders List
  • Pre-Bid Conference Attendance 8/6/2024
  • Bid Opening Meeting Room Change Notification
  • Addendum No 1
  • Addendum No 2
  • Addendum No 3
  • Addendum No 4 - Addendum Narrative
  • Addendum No 4 - EcoTech - Valve and Actuator Procurement Contract Documents
  • Addendum No 4 - Kazmier - Flow Meter Procurement Contract Documents
  • Addendum No 4 - MR Systems SCADA Proposal
  • Addendum No 4 - Wesco - eHouse Buildings Procurement Contract Documents (1)
  • Addendum No 4 - Xylem - Submersible Pumps and VFDs Procurement Contract Documents
  • Addendum No 5

Description

The Project consists of improvements to convert the existing wet well / dry pit pump station into a submersible pump station with six (6) new variable speed submersible wastewater pumps and appurtenances. Four of the pumps will be high-flow pumps, and two will be low-flow pumps to match off-peak duty flow conditions. Isolation valves will be installed on the two pump station effluent force mains. Two magnetic flow meters will be installed in a concrete vault on the force mains. The existing Electrical Building will be demolished, and two prefabricated electrical buildings (eHouses) will be provided to house the variable frequency drives (VFDs), electrical distribution, motor control equipment, and SCADA controls with temperature and humidity control. The Owner is proceeding with early procurement of the new pumps, VFDs, plug valves and actuators, flow meters, and eHouses, to be included in the Contract as Allowance items.

The Project will be awarded in one Contract. Fifty-one percent (51%) of the Work under the Contract Documents must be self-performed by the General Contractor. The Project will be awarded by base bid on a lump sum basis for the performance and completion of all Work required by the Contract Documents.

THE INVITATION TO BID FORM BELOW CANNOT BE USED FOR THIS BID.  PLEASE REFER TO THE PLAN DOCUMENTS UNDER SECTION 0100-INSTRUCTION TO BIDDERS.  A BID SUBMITTED THROUGH THE FORM BELOW WILL NOT BE ACCEPTED.

Project Phase

  • Phase 1
  • Phase 2
  • Phase 3
  • Phase 4
  • Phase 5

Bid Tabulation

  • Bid Tabulation

Bid Awarded to Lakeshore Engineering, LLC

Macon Water Authority logo
Open Facebook page in new window Connect with us on Nextdoor

Contact Us

478-464-5600 (Office)

478-741-9146 (Fax)

customercare@maconwater.org

790 Second St., P.O. Box 108
Macon, GA 31202

Quick Links

  • Bill Pay
  • Report a Problem
  • Education
  • News
  • Careers

Employee Links

  • Employee Mail Login
  • Employee VPN Access
Copyright © 2025 Macon Water Authority | Website Development by M&R Marketing